Publication: ADAPTACIÓN DE LINEA DE MONTAJE DE CAJAS DE VELOCIDAD PARA INTEGRACIÓN DE NUEVO MODELO DE CAJA JH7-510
dc.contributor.advisor | SARIEGO PASTEN, PEDRO MARCO | |
dc.contributor.author | INTRIAGO LEIVA, ESTEBAN CAMILO | |
dc.contributor.department | Universidad Tecnica Federico Santa Maria UTFSM INGENIERÍA MECÁNICA | es_CL |
dc.contributor.other | MENA YANSSEN, RAFAEL GERARDO | |
dc.coverage.spatial | Universidad Técnica Federico Santa María UTFSM. Casa Central Valparaíso | es_CL |
dc.date.accessioned | 2019-12-04T19:52:17Z | |
dc.date.available | 2019-12-04T19:52:17Z | |
dc.date.issued | 2019 | |
dc.description | Catalogado desde la version PDF de la tesis. | es_CL |
dc.description.abstract | En el siguiente trabajo se realizó el análisis del proceso de armado de una nuevacaja de velocidad para un vehículo en la empresa RENAULT CORMECANICA. Paraello, fué necesario modificar el proceso, analizar las características del nuevo modelo decaja de cambios, revisando todas las diferencias existentes respecto a los modelosfabricados hoy en día. Posteriormente se realizó el análisis del proceso de armado de lacaja de cambios, revisando todas las operaciones asociadas al montaje de piezas quecomponen la caja y las modificaciones necesarias para el montaje de piezas concaracterísticas diferentes a la de los modelos que se fabrican hoy en día. Posteriormentese realizó el diseño de los elementos sujetos a modificación, procurando garantizar tantoel proceso de fabricación del nuevo modelo de caja de velocidad, como también el delresto de los modelos que se fabrican hasta la fecha. Finalmente se realizó un análisis delos costos asociados a las modificaciones y el costo total estimado para su integración | es_CL |
dc.description.abstract | At this work was realized an assembly process analysis of a new vehicle gearboxfor RENAULT CORMECANICA factory. For this integration, was necessary a processmodification, analyze the new gearbox characteristics taking the differences between thetodays existing gearbox assembly. After it was made a complete analysis of the newgearbox assembly process, checking every assembly operation associated to the piecesthat are different from the ones that are used at todays gearbox assembly. After it wasmade de pieces design for assembly machines keeping the process adapted for differentgearbox models, without disturbing actual process performance. Finally, it was made acost analysis associated to the process modifications to obtain an estimated total cost forthis new gearbox integration. | eng |
dc.description.degree | Ingeniería Mecánica Industrial | es_CL |
dc.format.extent | 63 h. | |
dc.format.medium | CD ROM | |
dc.format.mimetype | application/pdf | |
dc.identifier.barcode | 3560900260653 | |
dc.identifier.uri | https://hdl.handle.net/11673/48023 | |
dc.rights.accessRights | A - Internet abierta www.repositorio.usm.cl y otros repositorios a la que la USM se adscriba | |
dc.subject | ARMADO DE CAJAS DE CAMBIO | es_CL |
dc.subject | CAJA DE VELOCIDAD | es_CL |
dc.subject | MONTAJE DE PIEZAS | es_CL |
dc.subject.other | INGENIERIA MECANICA INDUSTRIAL | es_CL |
dc.title | ADAPTACIÓN DE LINEA DE MONTAJE DE CAJAS DE VELOCIDAD PARA INTEGRACIÓN DE NUEVO MODELO DE CAJA JH7-510 | es_CL |
dspace.entity.type | Publication | |
usm.date.thesisregistration | 2017 | |
usm.identifier.thesis | 4500015100 |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- 3560900260653UTFSM.pdf
- Size:
- 7.83 MB
- Format:
- Adobe Portable Document Format
- Description: