EL REPOSITORIO SE ENCUENTRA EN MARCHA BLANCA

 

Thesis
SELECCIÓN DE ESTRATEGIAS DE CORTO PLAZO PARA LA EXPLOTACIÓN DE BANCOS EN MINAS A TAJO ABIERTO

dc.contributor.advisorENCINA MONTENEGRO, VÍCTOR
dc.contributor.authorESCALANTE SÁNCHEZ, JOSÉ IGNACIO
dc.contributor.departmentUniversidad Técnica Federico Santa María. Departamento de Ingeniería Metalúrgica y de Materialeses_CL
dc.contributor.otherVERGARA PONCE, FRANCISCO
dc.contributor.otherNAVARRO GUERRA, ANTONIO
dc.coverage.spatialCampus San Joaquín, Santiagoes_CL
dc.creatorESCALANTE SÁNCHEZ, JOSÉ IGNACIO
dc.date.accessioned2024-10-31T00:42:05Z
dc.date.available2024-10-31T00:42:05Z
dc.date.issued2018-12
dc.description.abstractEl presente trabajo muestra el diseño y selección de estrategias de corto plazo para la explotación de bancos en minas a tajo abierto denominado esquemas de explotación. Esto nace debido a la necesidad de realizar planificaciones detalladas y así disminuir la incertidumbre de los planes. Además, se busca encontrar la estrategia que otorgue el mayor ritmo de explotación basado en dos tipos de esquemas, aquel que posee polvorazos de contorno y el esquema que no considera este tipo de polvorazos. También se analiza y compara el ritmo de explotación obtenido de los diferentes casos con los ritmos utilizados en planificación de largo plazo. Para llevar a cabo la planificación detallada se realiza un levantamiento de todas las operaciones unitarias y actividades críticas para el correcto funcionamiento operacional de la mina, dentro estas se consideran: preparación de patios, perforación, voladura, carguío, movimiento de cable y limpieza de derrames. El estudio comienza con una breve descripción de los diseños de esquemas de explotación, donde se detallan los aspectos más relevantes que se consideran en la confección de los polvorazos como por ejemplo anchos de carguíos mínimos asociados a los equipos, anchos de rampas y tipos de esquema de explotación, entre otros. Luego se procede a la asignación de recursos y programación de las actividades para realizar la secuencia de explotación y así determinar la estrategia que entregue el mejor ritmo de explotación y mejores costos. Finalmente, se compara en base a la data real, los ritmos obtenidos para determinar si existen oportunidades de mejora en la extracción de los bancos.es_CL
dc.description.abstractThe present work shows the design and selection if short term strategies for the exploitation of bench in open pit mines called exploitation exploitation scheme methodology applied to open pit mines. This aims to make detailed plans and thus reduce the uncertainty of the plans. In addition, it seeks to find the strategy that gives the highest rate of exploitation based on two types of schemes, one that has contour dust and the scheme that does not consider this type of dust. The exploitation rate obtained from the different cases is also analysed and compared with the rates used in long term planning. To carry out the detailed planning, a survey is made of all the unit operations and critical activities for the correct operational operation of the mine, within these are considered: drill area preparation, drilling, blasting, loading, movement of cable and spill cleanup The study begins with a brief description of the designs of Exploitation Schemes, which details the most relevant aspects that are considered in the preparation of the dustings such as minimum load widths associated with the equipment, widths of ramps and types of Scheme of Exploitation, among others. Then proceeds the allocation of resources and programming activities to make the sequence of exploitation and determine the strategy that delivers the best rate of exploitation and best costs. Finally, the rhythms obtained are compared based on the actual data, to determine if there are opportunities for improvement in the extraction of bench.es_CL
dc.description.degreeINGENIERO CIVIL DE MINASes_CL
dc.description.programINGENIERÍA CIVIL DE MINASes_CL
dc.identifier.barcode3560902038914es_CL
dc.identifier.urihttps://repositorio.usm.cl/handle/123456789/61937
dc.subjectMINERIA A TAJO ABIERTOes_CL
dc.subjectEXPLOTACION MINERAes_CL
dc.subjectINDUSTRIA MINERAes_CL
dc.subject.otherINGENIERIA CIVIL DE MINASes_CL
dc.titleSELECCIÓN DE ESTRATEGIAS DE CORTO PLAZO PARA LA EXPLOTACIÓN DE BANCOS EN MINAS A TAJO ABIERTOes_CL
dc.typeTesis de Pregrado
dspace.entity.typeTesis

Files

Original bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
3560902038914UTFSM.pdf
Size:
8.61 MB
Format:
Adobe Portable Document Format