EL REPOSITORIO SE ENCUENTRA EN MARCHA BLANCA

 

Thesis
DESARROLLO DE PLATAFORMA INTEGRADA DE GESTIÓN Y CONTROL DE CAMBIO DE REVESTIMIENTOS EN CHANCADO Y MOLIENDA – EL SOLDADO

dc.contributor.advisorVALDERRAMA REYES, WALDO MARCELO
dc.contributor.authorACOSTA MÉNDEZ, FRANCISCO ANTONIO
dc.contributor.departmentUniversidad Tecnica Federico Santa Maria UTFSM INGENIERÍA METALÚRGICA Y DE MATERIALESes_CL
dc.contributor.otherESTAY VILLALÓN, SERGIO HERNÁN
dc.coverage.spatialUniversidad Técnica Federico Santa María UTFSM. Casa Central Valparaísoes_CL
dc.creatorACOSTA MÉNDEZ, FRANCISCO ANTONIO
dc.date.accessioned2024-10-30T20:34:34Z
dc.date.available2024-10-30T20:34:34Z
dc.date.issued2018
dc.descriptionCatalogado desde la version PDF de la tesis.es_CL
dc.description.abstractEn el presente informe se detallan las bases técnicas del desarrollo de la plataforma integrada para el control y gestión de cambio de revestimientos en equipos de molienda y chancado, implementada en la planta sulfuros de la Operación El Soldado de la compañía Anglo American.La plataforma, implementada en una Macro de Excel, es administrada por la Superintendencia de Ingeniería y Control de Procesos y es de acceso público a los trabajadores de la Gerencia Planta a través de un disco compartido.La plataforma gestiona y controla los cambios de revestimiento de la molienda de bolas, molienda SAG y las tres fases de chancado. La operación de esta consiste en el ingreso de datos de desgaste para posterior análisis y cálculo de fecha de cambio de revestimiento en función de los parámetros definidos por la Superintendencia de Ingeniería y Control de Procesos. Para el caso de la molienda convencional, se incluyen módulos de determinación de fecha para el cambio de revestimiento de acuerdo a la reducción de costos, y un programa MRP para la generación de un calendario maestro de adquisición de revestimientos.es_CL
dc.description.abstractThis report presents the detailed technical basis of the development of an integrated platform for the control and management of liner change y milling and crushing equipment, implemented on the sulfide plant of the Operación El Soldado controlled by the Anglo American company.The platform is implemented on an Excel Macros, is administrated by the Engineering and Process Control Superintendence and of public access to every worker on the Plant Management through a shared folder.The platform manages and controls the liner change in ball mills, the SAG mill and on the three stages of crushing. The operation consists on wear data input for further analysis and calculation of the liner change date in function of parameters defined by the Engineering and Control Process Superintendence. For the ball mills, it is included a module for liner change date determination that considers costs reduction, as well as an MRP program for the generation of a liner acquisition calendar.eng
dc.description.degreeINGENIERO CIVIL METALÚRGICOes_CL
dc.format.mediumCD ROM
dc.identifier.barcode3560900255178
dc.identifier.urihttps://repositorio.usm.cl/handle/123456789/61098
dc.rights.accessRightsB - Solamente disponible para consulta en sala (opción por defecto)
dc.subjectDESGASTE DE REVESTIMIENTOSes_CL
dc.subjectPLATAFORMA INTEGRADAes_CL
dc.subjectREVESTIMIENTO DE EQUIPOSes_CL
dc.titleDESARROLLO DE PLATAFORMA INTEGRADA DE GESTIÓN Y CONTROL DE CAMBIO DE REVESTIMIENTOS EN CHANCADO Y MOLIENDA – EL SOLDADOes_CL
dc.typeTesis de Pregradoes_CL
dspace.entity.typeTesis
usm.date.thesisregistration2017
usm.identifier.thesis4500015300

Files

Original bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
3560900255178UTFSM.pdf
Size:
3.1 MB
Format:
Adobe Portable Document Format