EL REPOSITORIO SE ENCUENTRA EN MARCHA BLANCA

 

Thesis
ESTUDIO DE LA PRODUCTIVIDAD DE UNA PLANTA CHANCADORA DE AGREGADOS

dc.contributor.advisorCARMONA MALATESTA, SERGIO
dc.contributor.authorGONZÁLEZ OLIVARES, OMAR ANDRÉS
dc.contributor.departmentUniversidad Tecnica Federico Santa Maria UTFSM OBRAS CIVILESes_CL
dc.coverage.spatialUniversidad Técnica Federico Santa María UTFSM. Casa Central Valparaísoes_CL
dc.creatorGONZÁLEZ OLIVARES, OMAR ANDRÉS
dc.date.accessioned2024-10-30T13:07:05Z
dc.date.available2024-10-30T13:07:05Z
dc.date.issued2016
dc.descriptionCatalogado desde la version PDF de la tesis.es_CL
dc.description.abstractEn términos generales, en la zona norte del país, se están realizando pilas de Biolixiviación para la extracción del cobre. Para ello, es necesario contar con una gran base estabilizada, en donde el material granular es procesado por medio de un chancador proporcionado por el mandante. Al ser un chancador de segunda mano, éste presenta fallas técnicas y problemas de ejecución por parte del contratista, quien atribuye dicho problema al uso que se le dio anteriormente al chancador y no por mérito propio.En base a esto, se utilizará la base de datos proporcionada por parte del propio contratista, para analizar la disponibilidad total de la planta durante 9 meses a partir de septiembre del 2011, con el fin de demostrar que ésta rinde según el diseño esperado, y además buscar posibles soluciones técnicas y logísticas que se deben aplicar para aumentar el rendimiento total de la planta y/o la gestión que se debe tener al momento de operarla.es_CL
dc.description.abstractIn general terms, in the north of the country, they are being built bioleaching batteries for copper extractionFor that, it is necessary to have a large stabilized base wherein the granular material is processed by a crusher provided by the client. As a crusher used, this presents technical failures and performance problems by the contractor, who the latter attributed the problem to the use that was given earlier to the crusher and not on merit Based on this, It will use the database provided by the contractor himself, to analyze the overall availability of the plant for nine months from September 2011, in order to demonstrate that this design performs as expected, and also look for possible technical and logistical solutions to be applied to increase the overall efficiency of the plant and / or management that must have when operating.eng
dc.description.degreeCONSTRUCTOR CIVILes_CL
dc.description.programCONSTRUCCIÓN CIVIL
dc.format.mediumCD ROM
dc.identifier.barcode3560900240021
dc.identifier.urihttps://repositorio.usm.cl/handle/123456789/58079
dc.rights.accessRightsB - Solamente disponible para consulta en sala (opción por defecto)
dc.subjectBIOLIXIVIACIONes_CL
dc.subjectMANTENCIONES PREVENTIVASes_CL
dc.subjectPLANTA DE CHANCADO DE RIOLITAes_CL
dc.titleESTUDIO DE LA PRODUCTIVIDAD DE UNA PLANTA CHANCADORA DE AGREGADOSes_CL
dc.typeTesis de Pregradoes_CL
dspace.entity.typeTesis
usm.date.thesisregistration2016
usm.identifier.thesis4500012362

Files

Original bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
3560900240021UTFSM.pdf
Size:
2.95 MB
Format:
Adobe Portable Document Format