Abstract
En esta problemática, se realiza una mejora de gestión, basada en la metodología Seis Sigma para la empresa Enviro en el rubro de bicicletas y motocicletas eléctricas, se realizará un estudio de las variables que significan alrededor del 80 % de las fallas totales y de los costos totales de falla, lo que significa que un porcentaje no menor de los costos de calidad de $24.203.392 que significan un porcentaje no despreciable de los costos directos. Además, de un alto costo con respecto a las fallas, de $5.858.300, dado esto el proyecto seis sigma tiene como objetivo disminuir las fallas. Mediante las herramientas Seis Sigma, es desarrollado el caso aplicado, en el cual, son determinados los diferentes síntomas o problemas de las bicicletas y motos eléctricas. Para luego, encontrar las causas raíces de las fallas que afectan a las bicicletas y motocicletas eléctricas, estas causas son fallas en los distintos componentes siguientes:Controlador, dpmo = 787Cargador, dpmo = 2.968Baterías, dpmo = 6.366Motor, dpmo = 2.717Este estudio está realizado enfocado en el ciclo de mejora continua DMAIC, a continuación se explica el desarrollo de este ciclo: La etapa de definir es clave en el desarrollo, para resolver de forma satisfactoria la problemática del trabajo, es por esto que se desarrollan las herramientas Seis Sigma, encontrando varios aspectos relevantes como cantidad de fallas, costos de fallas y otros aspectos críticos. En la etapa de medir, es necesario monitorear las fallas y desarrollar las herramientas Seis Sigma con respecto a los componentes del sistema que son el cargador, el controlador, las baterías y el motor. La etapa de análisis se enfoca en encontrar las causas raíces de las fallas de las motos y bicicletas eléctricas, mediante un análisis en profundidad de los factores y las fallas que afectan los subcomponentes críticos mediante herramientas Seis Sigma referidas a esta etapa. Electrónica de potencia, baterías calidad, otros. En instancias finales, se desarrolla un análisis de costos de mejoras y estimación de resultados, para la etapa de mejora. En el caso de la etapa de control, se realiza el monitoreo de los indicadores críticos Seis Sigma, dado esto se concluye acerca de los parámetros de falla de los componentes, como también acerca del diseño y confiabilidad de estos. Finalmente los ahorros estimados son $ 6.864.935.
In this problem, performing a management improvement, based on Six Sigma for the Enviro company in the business of electric bicycles and motorcycles, there will be a study of the variables that mean about 80% of total failures and Total costs of failure, which means that a percentage of not less than the cost of $ 24,203,392as meaning a considerable percentage of the direct costs. In addition, a high cost relative to the failures of components, of $ 5,858,300, as this six sigma project aims to minimize errors.Using Six Sigma tools, developed the case is applied, in which are certain symptoms or problems the different bikes and electric bikes. To then find the root causes of faults affecting electric bicycles and motorcycles, these causes are faults in individual components:Controller, DPMO = 787Charger, DPMO = 2,968Batteries, DPMO = 6,366Motor, DPMO = 2,717This study is conducted focused on continuous improvement DMAIC cycle, then explains the development of this cycle:The key is defining stage in development, successfully solving labor problems, which is why they develop Six Sigma tools, finding several relevant aspects such as number of failures, failure costs and other critical aspects.In the step of measuring, monitoring is necessary to develop faults and Six Sigma tools with respect to the components of the system are the charger, controller, batteries and engine.The analysis stage focuses on finding the root causes of the failures of the bikes and electric bikes by a thorough analysis of the factors and failures affecting critical subcomponents using Six Sigma tools related to this stage. Electronics power quality batteries, other.In final stages, we develop a cost analysis and estimation results improvements to the stage of improvement. In the case of the control stage is performed monitoring of critical indicators Six Sigma because it concludes about the parameters of component failure, as well as on the design and reliability of these.Finally the estimated savings are $ 6,864.935.
In this problem, performing a management improvement, based on Six Sigma for the Enviro company in the business of electric bicycles and motorcycles, there will be a study of the variables that mean about 80% of total failures and Total costs of failure, which means that a percentage of not less than the cost of $ 24,203,392as meaning a considerable percentage of the direct costs. In addition, a high cost relative to the failures of components, of $ 5,858,300, as this six sigma project aims to minimize errors.Using Six Sigma tools, developed the case is applied, in which are certain symptoms or problems the different bikes and electric bikes. To then find the root causes of faults affecting electric bicycles and motorcycles, these causes are faults in individual components:Controller, DPMO = 787Charger, DPMO = 2,968Batteries, DPMO = 6,366Motor, DPMO = 2,717This study is conducted focused on continuous improvement DMAIC cycle, then explains the development of this cycle:The key is defining stage in development, successfully solving labor problems, which is why they develop Six Sigma tools, finding several relevant aspects such as number of failures, failure costs and other critical aspects.In the step of measuring, monitoring is necessary to develop faults and Six Sigma tools with respect to the components of the system are the charger, controller, batteries and engine.The analysis stage focuses on finding the root causes of the failures of the bikes and electric bikes by a thorough analysis of the factors and failures affecting critical subcomponents using Six Sigma tools related to this stage. Electronics power quality batteries, other.In final stages, we develop a cost analysis and estimation results improvements to the stage of improvement. In the case of the control stage is performed monitoring of critical indicators Six Sigma because it concludes about the parameters of component failure, as well as on the design and reliability of these.Finally the estimated savings are $ 6,864.935.
Description
Keywords
CONTROL DE CALIDAD, CONTROL DE PROCESOS, ENVIRO LTDA